PROJECTS

Noreste Mitsubishi Project

INDUSTRY

Energy

DATE

May 2018

ORIGIN

Altamira

DESTINATION

El Carmen, NL

DISTANCE

80 km

DIMENSIONS

11.52m x 4.99m x 4.60m

WEIGHT

289 Tons

EQUIPMENT

Faktor 5

Noreste is a combined cycle power plant built by Iberdrola with two turbines, a gas turbine and a steam turbine, which were transported by Mucino transports from the port of Altamira. 

Self-propelled hydraulic modular equipment was used, with Factor 5 load beams (500 ton capacity) and 3 tractor trucks. 

Located in El Carmen, Nuevo León, with a capacity of 866 MW and its production is destined to the private sector in Mexico.

+ 0 km
Driven
+ 0
Satisfied Customers
+ 0
Professionals at your service 

Our Certifications