Adding to the experience of Transportes Muciño in the wind energy sector, in 2015, Gamesa wind turbine components Model G7, of 2 MW of unit power, were transported in the Pier II Project. According to the phases of this wind farm, the transportation of Blades with a length of 57m was resumed in 2018 and 2019.
Pier II became Iberdrola’s fifth wind farm in Mexico with a total of 33 wind turbines. It is located in the municipality of Esperanza, in the state of Puebla, in the south of the country, one of the windiest areas in Mexico.