Transportation of 150 Blades with a length of 57m leaving from TPI Composites Plant in CD Juarez, Chih. There was a stopover for storage at Tracomex located in the state of Aguascalientes until arriving at Parque Santiago Eolo located in San Pedro de Almoloya, Gto.
Santiago Eolo wind farm is the first wind farm in the state of Guanajuato, with a power of 105 megawatts and 50 windmills of 200 tons.